APPLICATION GUIDELINES:
- Apply two coats to a small test area. Allow first thin coat to dry 60-90 minutes.
- Apply a heavy second coat and back-roll excess for uniform appearance.
- Wait 24 hours to determine compatibility.
- If results are in any way unsatisfactory to you, contact a Lifeguard Representative.
SURFACE PREPARATION:
- Power-Washing with at least 2000 psi is recommended. General cleaning can be done by using Lifeguard Concrete & Masonry Cleaner in conjunction with power-washing. Read product container for specific instructions and cautions.
Allow at least 48 hours of drying time after power-washing.
LIMITATIONS:
- Do not apply to previously painted or sealed surfaces.
- Do not apply in direct sunlight, when the surface temperature is above 80F.
- Allow concrete & mortar to cure for at least three weeks.
- Treated areas are slippery when wet.
CLEAN UP
- Clean equipment with Lacquer Thinner.
DRYING TIME:
- Allow 24 hours for foot traffic.
- 24 hours for water exposure.
- Allow concrete & mortar to cure for at least three weeks.
- 72 hours for vehicle traffic.
COVERAGE RATES:
- Estimated coverage: 50-225 sq.ft/Gal.
IMPORTANT: Read product container before starting project.